Skip to content
Demonstration site of EURL rhanb. All content is fictitious. About this demonstration
AubrignyTown website (demonstration)
Français

Public inquiry into the local development plan From 26 October to 27 November, have your say on the revised local plan. Read the notice

Works and public space

Rue de la Gare: alternating traffic until 21 December

Resurfacing the road and building the cycle track mean traffic lights between avenue de la Gare and place du Marché.

Published on 15 October 2026

A triangular roadworks sign in the foreground, a yellow excavator and a worker in a high-visibility vest blurred behind (illustrative photo)
Roadworks — Photo: Miguel Teirlinck on Unsplash

The works on rue de la Gare are entering their second phase. Until 21 December, traffic lights control alternating traffic between avenue de la Gare and place du Marché, from 8:00 to 17:00.

The shops remain open and reachable on foot; parking moves to the station car park. Bus line A is diverted via rue des Tilleuls.

In the same section